Ensuring the safe delivery of precision vertical work platforms to overseas customers is a critical mission spanning oceans and continents. Pre-loading preparations directly determine whether equipment can withstand the rigors of extended international transport—from turbulent seas to relentless vibrations and the passage of time. Any oversight in detail risks transforming valuable machinery worth hundreds of thousands into scrap upon arrival.es
1. Vehicle Condition Verification
Full retraction state: Boom/platform must be fully retracted and lowered to its minimum position; outriggers/stabilizers completely withdrawn and mechanically secured with locking pins.
Power disconnection/isolation: Disconnect battery terminals (negative first), properly insulate and secure exposed cables to prevent short circuits.
Securing movable components: Confirm all doors (control/tool compartments), covers, accessories (e.g., remote controls) are locked or strapped down. Small items in toolboxes must be immobilized with padding.
Critical area protection: Implement rust-proofing measures and thorough cleaning.
2. Packing Material Preparation
High-tension strapping/chains、Dedicated fixing brackets/timber supports、
Wheel chocks/timber wedges to prevent rolling、Anti-slip materials、Cushioning/filler materials、Desiccant/dehumidifiers (calcium chloride recommended)
Pre-loading preparation is a battle of details—a testament to professionalism and accountability. Every locked outrigger, every certified strap, every deployed desiccant builds invisible bridges of safety across the oceans. HYNEE, as experts in indoor aerial solutions, embeds precision into every operation, ensuring China-manufactured access equipment stands firm on the global stage.
CONTACT