loading

Hynee Celebrates Another Milestone: 22 Units of Model 1110 Successfully Completed and Delivered

Recently, exciting news came from the production workshop of Hynee's new factory. With the completion of the final pre-delivery quality inspection for the last unit of Model 1110, it marks that all 22 units of Model 1110 in this bulk order have been completed in accordance with standards and smoothly shipped to the customer. This achievement is not only a strong proof of the new factory's production capacity release, but also demonstrates Hynee's solid strength in production performance and quality control.

微信图片_20251211163436_520_29 (2)

As a key customized order from the customer, the production task of 22 units of Model 1110 has received great attention from the company since its launch. From the strict screening in the raw material procurement link, to the refined control over key processes such as welding, assembly and commissioning during the production and manufacturing process, and then to the full-process inspection covering performance, safety and other dimensions before delivery, every step adheres to the 5S management standards implemented by Hynee's new factory, ensuring that each product meets customer requirements and industry norms.

IMG_8175

To ensure the on-time delivery of the order, we set up a special production team, optimized the production scheduling plan, and all departments collaborated closely. Especially in the assembly stage of core components, the technical team was on-site for guidance throughout the process and solved many production problems, said the workshop director in charge of this production task. It is understood that the production cycle of this order is 10% shorter than expected. While improving efficiency, the one-time qualification rate of products reaches 100%, which fully demonstrates the synergistic advantages of the new factory's advanced production equipment and efficient management model.

微信图片_20251211165641_601_6 (2)

At the delivery site, 22 units of Model 1110 were neatly arranged and gradually loaded onto the vehicles under the orderly dispatch of the staff. The customer's representative was present to participate in the acceptance. After checking the product appearance on the spot and testing the core performance, he highly praised Hynee's production speed and product quality: From order confirmation to product delivery, Hynee's response efficiency and performance ability have exceeded expectations, which makes us more confident in future cooperation.

微信图片_20251211163445_524_29

The successful delivery of 22 units of Model 1110 is another important achievement since the commissioning of Hynee's new factory. It not only lays a solid foundation for further deepening cooperation with this customer, but also accumulates valuable experience for the brand to expand into similar markets. In the future, Hynee will continue to be customer-oriented, rely on the hardware advantages and refined management system of the new factory, continuously improve production efficiency and product quality, and repay market trust with better products and services, moving forward steadily in the industry competition.

微信图片_20251211163454_529_29
prev
Hynee's Dual Flagships Embark! Two High-Performance New Products Shine at CONEXPO-CON/AGG 2026 USA
A specialized and in-depth technical training for the new product-4C-6100
next
recommended for you
no data
Get in touch with us
From the very beginning, we have been dedicated to providing customers with safer indoor and outdoor aerial work platforms.

CONTACT

+8618920287918

 info@hyneelift.com

111 Somerset Road

#09-0, Singapore 238164

Hynee Industries Pte. Ltd Copyright © 2025 | Sitemap
SHARE US
Copyright © Hynee Industries Pte. Ltd Copyright 2024 | Sitemap
Customer service
detect